• Opening Times: Mon - Fri 8.00 - 17.00
01642 677976 icf@lintondmc.co.uk
22b Wilson Street, Stockton on Tees, TS17 7AR

ICF Sustainable Home, Northallerton

ICF Development Facts:

  • Project Description: Rhodipor ICF Sustainable home comprising of two traditional storeys, room in the roof, and a split-level internal retaining wall.
  • ICF delivery route: full construction service from foundation level to completion.
  • Project Location: Northallerton, North Yorkshire.

ICF Construction Facts:

  • Foundations: traditional strip.
  • Floors: solid concrete ground floor, TGI flooring to all other floors.
  • Walls: 400mm thick
  • Finish: render applied directly to the ICF walling with foam stone heads and cills to windows.
  • Roof: traditional cut roof on purlins, allowing habitable rooms in the roof.
  • Covering: roman pantile

ICF Case study:

Water Disposal: Water is to be re-used through a rainwater harvesting system, whilst all foul water is to be cleaned through a package treatment plant and discharged on to the surrounding land.

Heating: Ground source heating (coils laid into the surrounding land) connected to underfloor heating to all floors, with mechanical heat recovery ventilation throughout.

Interesting Fact:

The low U-value of 0.14 W/m²K Rhodipor Ecobuild walling and the additional green features have allowed the client to apply for an eco-mortgage which has a reduced interest rate.