• Opening Times: Mon - Fri 8.00 - 17.00
01642 677976 icf@lintondmc.co.uk
22b Wilson Street, Stockton on Tees, TS17 7AR

ICF stone finished Home, Durham

ICF Development Facts:

  • Project Description: two-storey Rhodipor Ecobuild family home.
  • ICF delivery route: Shell only, with the client managing all other areas of the build.
  • Project Location: Sacriston, Durham

ICF Construction Facts:

  • Foundations: reinforced concrete raft
  • Floors: solid ground floor, first-floor beam and block.
  • Walls: Ecobuild 3 with 50mm cavity and stone outer skin.
  • Finish: rubble stone.
  • Roof: attic truss rafter roof.
  • Roof: slate.
  • Heating: underfloor heating to ground and first floor with mechanical heat recovery ventilation throughout.